ADVISORY

Product-level decision clarity ahead of regulatory implementation

This advisory is founder-led by Henrietta Szakonyi and works closely with product teams facing regulatory and structural change. Work begins before companies invest in new systems, processes, or remade structures, when clarity is needed on what to develop, adjust, reduce, or stop.

WHY ACT NOW

Regulatory, material, and market pressure on product decisions is increasing: for products still in development, and for stock that already exists. Early decisions determine whether future repair, remade, and compliance costs stay manageable, or become structural. The same logic applies whether that decision is still open, or already sitting in a warehouse.

One method, two moments: before a product exists, and after it didn't sell

Product Futures Check

UPSTREAM · before it is locked in

One product group. Start with one representative product, leave with a decision logic your team applies every season.

WHEN THIS IS USEFUL

  • A carry-over decision is due: keep it, adjust it, or replace it

  • A material or construction choice already shipped, and no one has calculated what it costs under current fee rules

  • The same complaint keeps appearing at the same point

  • A regulation lands and someone asks whether the core range is exposed

HOW IT WORKS

Stage 1 · Pilot. One representative product, worked through with your team. You receive one of three clear outcomes (On Track, One Decision to Revisit, Direction Needs Rethinking), the fee exposure where fee rules apply, the lever that actually moves the number, and the reasoning in writing.

90 min session, remote · memo in 3 to 5 days · from €1,800 excl. VAT

Stage 2 · Rollout. The decision points become a template for the whole product group, built to fit your tech pack or PLM, with a short team training. On request.

Stage 3 · Season Review. A fixed session before each tech pack sign-off, so the logic keeps pace with the range. On request.

Surplus Recovery Assessment

DOWNSTREAM · after it didn't sell

One product. A decision between several possible paths, not a design study.

WHAT YOU GET

  • Why it underperformed, read from your own sell-through and return data

  • Concrete intervention variants: Repositioned, Made to Last, Reconstructed

  • Visuals, estimated time and cost per piece

  • One clear recommendation, including how to split stock across paths

REALITY CHECK

"We won't recommend producing a new collection's worth of stock. The goal is solving today's surplus without creating tomorrow's."

Full picture: diagnosis + intervention options · within three weeks €4,800, excl. VAT · or €450, excl. VAT, for the diagnosis alone, if no viable path is found